CCUS projects in Europe
- Capture
- Transport
- Storage
EU
63
CO2 capture projects
14
countries with CO2 capture projects
Europe
21
CO2 capture projects
4
countries with CO2 capture projects
EU
25
CO2 transport projects
11
countries with CO2 transport projects
Europe
19
CO2 transport projects
3
countries with CO2 transport projects
EU
15
CO2 storage projects
7
countries with CO2 storage projects
5
MT CO2/Year CO2 capacity injection by 2030
Europe
19
CO2 storage projects
3
countries with CO2 storage projects
7
MT CO2/Year CO2 capacity injection by 2030
Name
Country
Elements of the CCS Value Chain covered
Status
Planned start of operations date
Capacity at start date (Mtpa)
Steelanol
Belgium
Capture
In operation
8 DEC 2022 - ArcelorMittal inaugurates flagship carbon capture and utilisation project at its steel plant in Ghent.
0
CO2 EOR Project Croatia
Croatia
CaptureTransportStorage
In operation
The injection of CO2 in Ivanić oilfield started in October 2014 and northern part of Žutica oilfields in October 2015.
0
Greensand
Denmark
CaptureStorageTransport
In operation
If successful, the pilot would lead to full-scale CO2 storage in the Nini West field by 2025
0
SHARC
Finland
Capture
Early Development
The final investment decision is expected to be made in 2023, with planned start in 2025/26.
0
DMX Demonstration in Dunkirk (“3D” project)
France
Capture
Advanced Development
2025 full-scale CCS plant of 1 Mtpa - 10 Mtpa by 2035
0
Pycasso – PYrenean Carbon Abolition through Sustainable Sequestration Operations
France
CaptureTransportStorage
In planning
2030
1
H2GE Rostock
Germany
Capture
In planning
Production might begin in 2029 if a FID is reached in 2025 or 2026 for the roughly one billion euro investment project. The unresolved difficulties will be clarified through a feasibility study.
2
H2morrow
Germany
Capture
Early Development
The full value chain of the project could be put into operation by 2027 the earliest and 2030 the latest.
1.9
Leilac 2
Germany
Capture
Advanced Development
The demontration plant aims to become operational by 2025.
0.1
H-Vision
Netherlands
Capture
Early Development
H-vision provides for the construction of two hydrogen plants: Plant 1 in 2027 (750 megawatts of low-carbon hydrogen) Plant 2 in 2032 (1,500 megawatts of low-carbon hydrogen).
0
Twence CO2 capture plant
Netherlands
Capture
Advanced Development
The plant is expected to start operating in the last quarter of 2023.
0.1
AZUR
Netherlands
Capture
In planning
The aim is to start capturing CO2 in the third quarter of 2026.
0.8
Go4ECOPlanet
Poland
Capture
In planning
The vision for Go4ECOPlanet is to create a net-zero plant by 2027.
0
Poland – EU CCS Interconnector
Poland
Transport
In planning
Start-up of first facilities is planned in 2025 – 2026
2.7