TotalEnergies’ Normandy platform

The project involves a) the connection of an existing 255 tons-per-day hydrogen production unit found at the TotalEnergies’ Normandy platform, with Air Liquide’s low-carbon hydrogen network; b) the construction of a CO2 Capture unit with a capacity of 0.65 Mtpa by 2030; The CO2 captured will be transported and stored through the Northern Lights (Norway) and Aramis (Netherlands) projects.
Project type:Capture Participants:Air Liquide TotalEnergies Country:France Type of capture:Fuel Production (Hydrogen) IOGP members involved: TotalEnergies Planned start of operation: 2030 CO2 capacity at start date: 0.65 CO2 capacity after completion: 0.65 Status: In planning Type of storage: Not applicable Funding and support scheme: Info related to the funding and support scheme: Notes: Links: https://totalenergies.com/media/news/press-releases/totalenergies-and-air-liquide-partner-develop-low-carbon-hydrogen