Net Zero Teeside
Net Zero Teesside (NZT) along with the Zero Carbon Humber (ZCH) and the Northern Endurance Partnership (NEP) constitute the East Coast cluster which is the most carbon intensive industrial cluster in UK. The Net Zero Teesside projects will enable hydrogen economy, large-scale industrial carbon capture and bioenergy with CCS (BECCS) in the Teesside region with the NZT Power project to capture and store up to 2Mtpa of CO2 by 2026. Northern Endurance Partnership (NEP) which BP leads as operator, will provide the infrastructure needed to transport (via an offshore pipeline 145 km) and permanently store the captured CO2 at the at the Endurance aquifer (North Sea).
Project type:CaptureStorageTransport
Participants:BP Eni Equinor Shell Total Teeside Valley Authority Suez BOC sembcorpCF Lotte Chemical Nepic UK BEIS
Country:United Kingdom
Type of capture:Cluster (multiple industrial sources)
IOGP members involved: BP, Eni, Equinor, Shell, Total
Planned start of operation: 2027
CO2 capacity at start date: 2
CO2 capacity after completion:
Status: Advanced Development
Type of storage: Offshore - Saline Aquifer (Endurance), British North Sea
Funding and support scheme: National funding
Info related to the funding and support scheme:
Notes:
Links: https://www.netzeroteesside.co.uk/https://www.geos.ed.ac.uk/sccs/project-info/962https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/EN010103/EN010103-001613-NZT%20DCO%203.3a%20-%20Supplementary%20Funding%20Statement%20-%20May%202022.pdf